Construction driven engineering

New method bears fruit
During the construction of the Norgron-line for client NAM an innovative process has been deployed and used, called ‘construction driven engineering’. The essence of this method is that it allows us to apply our knowledge and expertise from the initial stages of the project.

The gas pipeline between the gas field of Groningen and gas storage Norg is simply called "Norgron. A.Hak Pipelines & Facilities was from the beginning of the construction of the pipeline involved in the engineering and permit applications. Through construction driven engineering we were able to correctly and successfully apply our decades of experience in the field of pipeline construction as early as the engineering phase.

Technical puzzle
In a more traditional approach, the of a contractor usually starts after the engineering and licensing procedures have been completed. At Norgron we have solved the technical puzzle together with the client. We thought, together with all stakeholders, about the best way to construct the pipeline. From day one we also were involved in consultations with relevant organizations.

Safely, on schedule and within budget
Because of construction driven engineering we didn’t encounter any major problems. This method proved to be a good way to complete projects safely, on time and within budget. This is underlined by a particularly high Achilles FPAL score in the report that reflected our performance: only eights and nines.

Photobook
We made a photobook about the construction of the pipeline. You can take a look underneath:
is laid in a photo book to see here in three parts:
Text
Illustrations part 1
Illustrations part 2

  • projects

    Oil pipeline Fier Albania Oil pipeline Fier Albania

    Oil pipeline Fier Albania

    A.Hak International partnered up with A.Hak Drillcon to built an oil pipeline between the Albanian places Fier and Vlore. This job required 18 HDD drillings.

  • news

    Project film Beverwijk-Wijngaarden Project film Beverwijk-Wijngaarden

    Project film Beverwijk-Wijngaarden

    A.Hak constructed two thirds of Gasunie's gas transport pipeline between the Dutch towns of Beverwijk and Wijngaarden.

  • news

    TBM Mary is halfway her journey TBM Mary is halfway her journey

    TBM Mary is halfway her journey

    Mary, National Grid’s 510 tonne tunnel boring machine, is now halfway through her 5 km journey under the River Humber.

  • news

    Cameras rolling at the Humber project Cameras rolling at the Humber project

    Cameras rolling at the Humber project

    The replacement of the gas pipeline under the Humber River in England is attracting the attention of camera crews, including those of the BBC.