North-South Route

Customer
N.V Nederlandse Gasunie

Description
Construction of multiple natural gas transport pipelines and compressor stations in the Netherlands

Timeframe
2008 – 2013

Pipeline information
Diameter: 2" up to 48"
Wall thickness: 5.5 up to 22 mm
Material: steel

Gasunie has put a lot of effort in turning the Netherlands into the gas hub of Europe. The North-South Route, a significant expansion of Gasunie’s gas transport network in the Netherlands, plays an important role in attaining this objective. Many kilometers of extra natural gas transport pipelines were constructed and various new compressor stations were built. For corporations trading gas, the Netherlands becomes increasingly attractive to transport gas to and from. We significantly contributed to this ambition.

Completed project segments

  • Trajectory ‘Meeden – Ommen’. 88 kilometers of 48" gas transport pipeline.
  • Compressor station ‘Scheemda’. Installation of pipeline work. Approximately 2,500 welds were completed. Pipeline diameters from 2" to 48", wall thickness between 5.5 and 22 mm.
  • Trajectory ‘Angerlo – Beuningen’. 37 kilometers of 48" gas transport pipeline. This relatively short trajectory was completed innovatively with 10 horizontal directional drillings and multiple microtunneling drillings.
  • Trajectory ‘Ommen – Esveld’. 36 kilometers of 48" transport pipeline including a Direct Pipe drilling, the length of which set a world record of 1,400 meters. 
  • Compressor station ‘Ommen’. 18" pipeline replaced with a 36" pipeline, keeping the compressor station operational during work.
  • Compressor station ‘Wijngaarden’. Construction of all underground pipelines, diameters 2" to 48".
  • Trajectory ‘Hommelhof – Schinnen’. 19 kilometers 48" gas transport pipeline in the hilly landscape of Dutch Limburg and the city of Sittard. Work in residential areas asked for a different approach than in rural areas.
  • Trajectory ‘Odiliapeel – Melick’. 28 kilometers of 48" gas transport pipeline, crossing the Meuse River with a Direct Pipe Drilling.
  • news

    A.Hak wins Tytan Award 2017 A.Hak wins Tytan Award 2017

    A.Hak wins Tytan Award 2017

    A.Hak Leidingbouw won the Tytan Award 2017 with the rehabilitation of a production water pipeline by means of a trenchless pipe-in-pipe method for client Nederlandse Aardolie Maatschappij BV (NAM).

  • news

    TAP: safely and swiftly TAP: safely and swiftly

    TAP: safely and swiftly

    Together with Spiecapag, A.Hak International constructs the Albanian segment of the Trans Adriatic Pipeline. The work is progressing safely and swiftly.

  • news

    Project film Beverwijk-Wijngaarden Project film Beverwijk-Wijngaarden

    Project film Beverwijk-Wijngaarden

    A.Hak constructed two thirds of Gasunie's gas transport pipeline between the Dutch towns of Beverwijk and Wijngaarden.

  • projects

    Bergermeer Gas storage facility Bergermeer Gas storage facility

    Bergermeer Gas storage facility

    For the construction of the largest underground gas storage facility in Western Europe A.Hak Leidingbouw constructed eight pipelines. The combined length of the tubing was 37.5 kilometers.