• Multidisciplinary
  • Multidisciplinary
  • Multidisciplinary
  • Multidisciplinary

Multidisciplinary

All round partner
A.Hak Pipelines & Facilities is one of the four divisions of the multidisciplinary group of companies of A.Hak. As a division we are versatile. We lay transportation pipelines and all the associated equipment, as well as transmission cables both in the field and working in an industrial environment. Through close collaboration with our sister companies we are able to extend the capabilities of our service even further.

Complete service
A.Hak features specialists in the fields of coating, trenchless construction (drilling) and dewatering. They can ensure that the pipes that we build are protected, that obstacles can be crossed easily and that groundwater does not hinder the work. Moreover A.Hak offers an integrated package of industrial services such as inspection, cleaning, testing, commissioning and nitrogen related services.

  • news

    A.Hak wins Tytan Award 2017 A.Hak wins Tytan Award 2017

    A.Hak wins Tytan Award 2017

    A.Hak Leidingbouw won the Tytan Award 2017 with the rehabilitation of a production water pipeline by means of a trenchless pipe-in-pipe method for client Nederlandse Aardolie Maatschappij BV (NAM).

  • projects

    aQuaintance aQuaintance

    aQuaintance

    aQuaintance, a new company of A.Hak Leidingbouw, Tebodin and Cofely, has signed a five year contract for the engereering, procurement and implementation of all national onshore projects for NAM.

  • news

    Project film Beverwijk-Wijngaarden Project film Beverwijk-Wijngaarden

    Project film Beverwijk-Wijngaarden

    A.Hak constructed two thirds of Gasunie's gas transport pipeline between the Dutch towns of Beverwijk and Wijngaarden.

  • projects

    Bergermeer Gas storage facility Bergermeer Gas storage facility

    Bergermeer Gas storage facility

    For the construction of the largest underground gas storage facility in Western Europe A.Hak Leidingbouw constructed eight pipelines. The combined length of the tubing was 37.5 kilometers.