• Innovative sinds 1963

Innovative sinds 1963

Experienced and innovative
Since its inception in 1963, A.Hak has more than fifty years of experience in the field of pipeline construction and the construction and maintenance of installations such as compressor and pumping stations. In the Netherlands and beyond, with a huge amount of different environmental conditions and soil types.


This experience, which has given us a nice list of references, does not prevent us from continually searching for ways to do our job even better. For example, with innovative methods such as construction driven engineering and Lean management. But even in the most complex project we welcome any challenge.

  • projects

    Bergermeer Gas storage facility Bergermeer Gas storage facility

    Bergermeer Gas storage facility

    For the construction of the largest underground gas storage facility in Western Europe A.Hak Leidingbouw constructed eight pipelines. The combined length of the tubing was 37.5 kilometers.

  • news

    TAP: safely and swiftly TAP: safely and swiftly

    TAP: safely and swiftly

    Together with Spiecapag, A.Hak International constructs the Albanian segment of the Trans Adriatic Pipeline. The work is progressing safely and swiftly.

  • news

    aQuaintance 10 years LTI free aQuaintance 10 years LTI free

    aQuaintance 10 years LTI free

    aQuaintance, the company responsible for the onshore projects of NAM, reached a unique safety milestone. The company, with shareholders A.Hak Leidingbouw, ENGIE and Tebodin, has worked for ten years without LTI’s.

  • projects

    Oil pipeline Fier Albania Oil pipeline Fier Albania

    Oil pipeline Fier Albania

    A.Hak International partnered up with A.Hak Drillcon to built an oil pipeline between the Albanian places Fier and Vlore. This job required 18 HDD drillings.