• About us
  • About us
  • About us

About us

Why do you choose A.Hak Pipelines & Facilities?
Our clients work with us for a lot of different reasons. Our problem solving mentality, extensive educational possibilities for our staff, state of the art equipment and materials and the capacity to join forces with local partners.

We highlight the three most important reasons:

  • We have over fifty years of experience but never cease to innovate.
  • Safety and quality are our top priorities and we have the certificates and the references to prove it
  • Together with our sister companies we carry out turnkey projects from design to commissioning.
  • news

    CSS: Humber project scores exceptionally CSS: Humber project scores exceptionally

    CSS: Humber project scores exceptionally

    The Considerate Constructors Scheme (CSS) has audited the A.Hak, Skanska and PORR joint venture that works on the River Humber Gas Pipeline Replacement Project for National Grid (UK). The project scored 44 out of 50 points.

  • news

    Drone images River Humber Gas Pipeline Replacement Project Drone images River Humber Gas Pipeline Replacement Project

    Drone images River Humber Gas Pipeline Replacement Project

    Watch the site of the River Humber Gas Pipeline Replacement Project from above.

  • projects

    Heat transfer pipeline under water Heat transfer pipeline under water

    Heat transfer pipeline under water

    Several A-Hak companies have contributed to the realization of a double heat transport pipeline. The pipeline makes it possible to use waste heat from two plants in the heating of a residential area.

  • news

    A.Hak takes part in Trans Adriatic Pipeline A.Hak takes part in Trans Adriatic Pipeline

    A.Hak takes part in Trans Adriatic Pipeline

    A.Hak International will be involved with SPIECAPAG in the construction of the Albanian sections of the Trans Adriatic Pipeline.